JPT : Journal of petroleum technology - Vol. 39, No. 3 (Mar. 1987) ; p. 253-388

Selecting a perforating system / G.E. King -- Determining project profitability / R.D. Seba Tender-supported operations at the odin field / E.L. Smith -- Subsea template drilling in the North Sea- experience gained during the initial stages of the balmoral development / D. Thorpe -- Minimum area rig concept update: H&P 101 modifications and first infield move / S.R. Sigurdson -- CSAMT mapping of a utah tar sand steamflood / J.R. Wayland -- Wellbore refluxing in steam-injection wells / G.P. Willhite -- Forty-seven years' gas injection in a preferentially oil-wet, low-dip reservoir / C.R.K. Murty -- Prospective role of Canada in meeting U.S. natural gas demand / F. Puziene.

0149-2136

Powered by Koha