000 | 00799nam a22001577a 4500 | ||
---|---|---|---|
008 | 140202b ck ||||| |||| 00| 0 spa d | ||
022 | _a0120-8322 | ||
090 | _a8033137081 | ||
245 | 1 | 0 | _aPetroleum engineer international |
264 | _aDallas : Energy Publications, 1987 | ||
362 | 1 | _aVol. 59, No. 11 (Nov. 1987) ; 58 p. | |
505 | 0 | 0 | _aHow California operators improve heavey oil production / Rich McNally -- Well control team caps underwater |
505 | 0 | 0 | _ablowout, part 1 -- Equipment selection critical to EOR operations / Dennis Spriggs -- Fiberglass line pipe |
505 | 0 | 0 | _arequires special care / Charles L. Oney -- Scssv reilability tested in North Sea / E. Molnes -- Gas storage |
505 | 0 | 0 | _aboosts oil recovery / W.B. Bleakley -- Reduce lifting costs with scada systems / Thomas A. Hudgins. |
999 |
_c18555 _d18555 |