000 00874nam a22001697a 4500
008 140202b ck ||||| |||| 00| 0 spa d
022 _a0164-8322
090 _a8033137069
245 1 0 _aPetroleum engineer international
264 _aDallas : Energy Publications, 1988
362 1 _aVol. 60, No. 5 (May. 1988) ; 90 p.
505 0 0 _aUsers guide to oil and gas valves -- Deep packerless completion maintains high capacity / T.R. Dever --
505 0 0 _aSteerable system cuts straight hole drilling costs 50% / Darrell Nordquist -- Simple method determines gas
505 0 0 _aflow rate / William C. Barron -- Vendors provide wide array of MWD tools -- Why drill strings fail at the
505 0 0 _aneutral point / Wilson C. Chin -- Drilling rigs designed for earthquakes / Jose Cardenas -- Program
505 0 0 _aaccelerates three-phase oil-gas separator design / M.S. Bizanti.
999 _c18543
_d18543