000 01316nam a22002057a 4500
008 140202b ck ||||| |||| 00| 0 spa d
090 _a8033137009
245 1 0 _aPetroleum engineer international
264 _aDallas : Energy Publications, 1982
362 1 _aVol. 54, No. 1 (Jan. 1982) ; 216 p.
505 0 0 _aDevelopers account for 80% of wells drilled in the U.S. / Rich McNally -- Diamond turbodrilling experiments
505 0 0 _aprove profitable / Jacques Cortes -- Chevron succeeds with extended-Nozzle bits in Texas / Mike Sellers --
505 0 0 _aDrilling problems don't slow williston basin operators / Steven D. Moore -- Well completions and workovers,
505 0 0 _apart 21 / L. Douglas Patton -- Guyed tower design and analysis, part 4 / Marius J. Mes -- Simulators ease
505 0 0 _adrilling industry training problems / Steve Allen -- Astro drilling gets new mobile rig for mid-continent /
505 0 0 _aStaff Report -- Petroleum fluids pac solves engineering problems / D. Nathan Meehan -- Undestanding your BOP
505 0 0 _ais critical for rig-site safety / Steven D. Moore -- Inhibitive drilling fluids solve ancilla shale problems
505 0 0 _a-- Mud pump failure analysis, part 5 / Edwin C. Lewis II -- Correct safety glasses promote good work habits /
505 0 0 _aRandall N. Reichle.
999 _c18482
_d18482