245 | 1 | 0 | _aPetroleum engineer international |
264 | _aDallas : Energy Publications, 1981 | ||
362 | 1 | _aVol. 53, No. 11 (Sep. 1981) ; 230 p. | |
505 | 0 | 0 | _aDrilling boom takes on international proportions / Rich McNally -- How a drilling contractor views changing |
505 | 0 | 0 | _atrends / Bill R. Jones -- Elf drills more than 1000 ft horizontally / Andre P. Jourdan -- Downstream |
505 | 0 | 0 | _aoperations limit earnings / Greg Martin -- Gas calculations aid submersible pump selections / John Beavers -- |
505 | 0 | 0 | _aModerns production risers. Part. 9. The frequency domain method for production riser analysis / Larry |
505 | 0 | 0 | _aKrolikowski -- Conquering Alaska's arctic drilling problems. Part 3. Completion techniques and drilling rigs / |
505 | 0 | 0 | _aSteven D. Moore -- A program to calculate deep water moorings at high loads / Marius J. Mes -- How the world's |
505 | 0 | 0 | _alargest seawater injection system was designed / John B. Morrison -- New downhole steam generator tested / |
505 | 0 | 0 | _aW.B. Bleakely -- How plunger lift affects production / Ernest M. Beauregard -- Mud pump failure analysis. Part |