000 | 01526nam a22002297a 4500 | ||
---|---|---|---|
008 | 140202b ck ||||| |||| 00| 0 spa d | ||
022 | _a0149-2136 | ||
090 | _a8033136037 | ||
245 | 1 | 0 | _aJPT : Journal of petroleum technology |
264 | _aDallas : Society of Petroleum Engineers of AIME, 1984 | ||
362 | 1 | _aVol. 36, No. 4 (Apr. 1984) ; p. 537-694 | |
505 | 0 | 0 | _aDiscussion of pressure buildup from a vertically fractured low-permeability formation / T. Chen -- |
505 | 0 | 0 | _aDistinguished author series: Interpretation of tests in fissured reservoirs and multilayered with |
505 | 0 | 0 | _adouble-porosity behavior: theory and practice / A.C. Gringarten -- Corrosion prevention for offshore platforms |
505 | 0 | 0 | _a/ F.W. Schremp -- Hydrogen-induced damage in sour, wet crude pipelines / E.M. Moore -- Viability and portfolio |
505 | 0 | 0 | _aanalysis as tools for exploration strategy development / A.N. Quick -- Usefulness of steel or rubber drillpipe |
505 | 0 | 0 | _aprotectors / A. Lubinski -- Drill collar length is a major factor in vibration control / D.W. Dareing -- |
505 | 0 | 0 | _aSubsurface electrical centrifugal pumps / E.D. Coltharp -- Soft start of submersible pumped oil wells / A.B. |
505 | 0 | 0 | _aNeely -- Sensitivity and reliability of two fracture detetion techniques for borehole application / R.L. |
505 | 0 | 0 | _aKleinberg -- A prediction technique for immiscible processes using field performance data / I. Ershaghi -- The |
505 | 0 | 0 | _asecondary recovery project at ogharete field, Nigeria / D. Aron. |
999 |
_c18362 _d18362 |