000 01187nam a22001937a 4500
008 140202b ck ||||| |||| 00| 0 spa d
022 _a0149-2136
090 _a8033136019
245 1 0 _aJPT : Journal of petroleum technology
264 _aDallas : Society of Petroleum Engineers of AIME, 1978
362 1 _aVol. 30, No. 10 (Oct. 1978) ; p. 1361-1506
505 0 0 _aTechnology summary / J.G. Richardson -- A north sea model for detailed current and water-level predictions /
505 0 0 _aG.S. Rodenhuis -- Fire protection on the beryl a platform / O.M. Slye -- Environmental conditions on the
505 0 0 _acontinental shelf off west greenland / A. Hasle Nielsen -- Installation of a deep-water, subsea completion
505 0 0 _asystem / W.H. Stone -- Acoustic telemetry- a step toward an underwater alternative / D.R. Witmer -- New uses
505 0 0 _aof existing technology for controlling blowouts: chronology of a blowout offshore Louisiana / James B. Lewis
505 0 0 _a-- Pumpdown (TFL) technology for subsea completions / H.P. Arendt -- Reliability of offshore structures /
505 0 0 _aSvein Fjeld -- The influence of internal waves on deep-water drilling / A.R. Osborne.
999 _c18342
_d18342