000 | 02831nam a22003737a 4500 | ||
---|---|---|---|
008 | 140202b ck ||||| |||| 00| 0 spa d | ||
082 | 0 | 4 | _a622.23 / S678of |
110 | 1 |
_aSociety of Petroleum Engineers -SPE- _993720 |
|
245 | 1 | 0 | _aOffshore production operations / Society of Petroleum Engineers |
264 | _aDallas : Society of Petroleum Engineers, 1983 | ||
300 | _a384 p. ; 29 cm. | ||
490 | 0 |
_aSPE reprint series _vNo. 17 _998691 |
|
505 | 0 | 0 | _aProduction platforms -- fixed platforms -- Desing of the cognac platform for 1025 feet water depth, Gulf of |
505 | 0 | 0 | _aMexico / GH. Sterling -- Construction of the cognac platform for 1025 feet water depth, Gulf of Mexico / G.H |
505 | 0 | 0 | _aSterling -- Cerveza- a project overview of a deep-water platform for the east breaks 160 field / Clif A. |
505 | 0 | 0 | _aTannahill -- Construction of the hondo platform in 850 feet of water in the Santa Barbara channel / John J. |
505 | 0 | 0 | _aBardgette -- Construction of an Artic Offshore Gravel Island in 39 ft or water during winter and summer / D.J. |
505 | 0 | 0 | _aAgerton -- Compliant platforms -- Desing criteria of a pile founded guayed tower / Andrea Mangiavacchi -- |
505 | 0 | 0 | _aMobile production systems -- First floating production facility -argyll / D.S. Hamment -- The buchan field |
505 | 0 | 0 | _adevelopment / E. Darnborough -- Tieback completions -- 400-foot tieback, offshore Brazil / Edmar C.A. Branco |
505 | 0 | 0 | _a-- Subsea completions -- Desing Principles for multi-Well Subsea production Equipment / Larry E. Reimert -- an |
505 | 0 | 0 | _aunderwater completion -the plain jane concept / N. Brammer -- The Casablanca subsea completion systems |
505 | 0 | 0 | _adesing, installation, and operation / John B. Strader -- Overview of the central central cormorant underwater |
505 | 0 | 0 | _acentre project (1974-1983) / Tom Bastiaanse -- Inspection, maintenance, and repair -- Inspection and |
505 | 0 | 0 | _amaintenance of frigg pipeline transportation system / Alain Bares -- Offshore storage and loading -- Seven |
505 | 0 | 0 | _ayears´ experience with the first deepwater SALM / R.H. Gruy -- Five years of oiptimizing and problem solving |
505 | 0 | 0 | _aal Saudi Arabia´s Ju´Aymah SPM Terminal / Bidah M. Gahtani -- Structural desing and maintenence -- Critical |
505 | 0 | 0 | _aparts regarding corrosion and corrosion protection of offshore structures / Erik Askheim -- In-service |
505 | 0 | 0 | _aexperiences with eleven offshore concrete structures / Sven Fjeld -- Structural inspection and maintennace in |
505 | 0 | 0 | _aa North Sea enviroment / Eric Charters -- Management of major offshore projects -an industry challenge / C.A. |
505 | 0 | 0 | _aVicklund -- Project management (North Sea) -basic and variable factors -- |
650 | 1 | 4 |
_aGas _xproduccion _9111413 |
650 | 1 | 4 |
_aIngeniería de petróleos _9113424 |
999 |
_c16789 _d16789 |